Structural Integrity Investigations
| PROJECT | SCOPE OF WORK | CLIENT | PERIOD |
| Existing Godown | Structural Integrity & Presentation of final report.
(Ferro Scan Testing, Schmidt Hammer Tests, Ultrasonic Pulse Velocity Tests) |
Dodhia Sawmills | 2021 |
| Structures at The Danco Plastics Factory in Ruiru Town Center, Kiambu County. | Limited | ||
| Proposed NDT Works on | Structural Integrity & Presentation
of final report. (Ferro Scan Testing, Schmidt Hammer Tests, Ultrasonic Pulse Velocity Tests) |
Zep-Re (Pta | 2021 |
| the Parking area of The | Reinsurance | ||
| Prosperity House Building, | Company) | ||
| Westlands, Nairobi County | |||
| Existing Boundary wall | Structural Integrity & Presentation
of final report. (Ferro Scan Testing, Schmidt Hammer Tests, Ultrasonic Pulse Velocity Tests) |
Polyflex Industries | 2021 |
| structure at Mavoko, | Limited | ||
| Machakos County. | |||
| Existing Structure at | Structural Integrity & Presentation
of final report. (Ferro Scan Testing, Schmidt Hammer Tests) |
Wagana Energy | 2021 |
| Kibuye Market, Kisumu | Limited | ||
| County. | |||
| Existing structure in | Structural Integrity & Presentation of final report. | Xenocon | 2021 |
| Ongata Rongai along | Consulting | ||
| Magadi Road | Engineers | ||
| Residential Building on | Structural Integrity & Presentation of final report. | Apex Systems | 2021 |
| Marcus Garvey Argwings | Consulting Group | ||
| Kodhek Road | Ltd. | ||
| Existing Structure at | Structural Integrity & Presentation of final report. | Dr. Fadh Al | 2021 |
| Muthangari Suites | Guthmy |
| Construction of Marsabit | Structural Integrity & Presentation
of final report. |
Aridlands | 2020 |
| County Stadium – Main | Construction | ||
| Pavilion Work | Company Ltd | ||
| 94- Mimosa Grove in | Structural Integrity & Presentation
of final report. |
Safety Surveyors | 2020 |
| Runda Estate, Nairobi | Limited | ||
| Taidys Hostels in Nakuru | Structural Integrity & Presentation
of final report. |
Avatech Consult | 2020 |
| Limited | |||
| Green Lake Plaza, Kisumu | Structural Integrity & Presentation
of final report. |
E.P.O. Engineers | 2020 |
| CBD | Ltd | ||
| The East African Breweries | Site investigation, laboratory testing,
structural integrity & presentation of final report. |
EABL | 2019 |
| Limited Premises, Ruaraka | |||
| Victory SDA Church | Site investigation, laboratory testing,
concrete testing and structural integrity & presentation of final report. |
Mokaya Ombengi | 2019 |
| Kisumu | Consulting | ||
| Engineers | |||
| Fanisi Heights Plot | Site investigation, laboratory testing, concrete testing and structural integrity & presentation of final report. | Sprinter Real | 2019 |
| No.Kiambaa/Kihara/7406 | Estate Investment | ||
| Ltd | |||
| Bridge International | Site investigation, laboratory testing,
concrete testing and structural integrity & presentation of final report. |
Elmuab Global | 2019 |
| School-Kiembeni Site | Engineering | ||
| Mombasa, Shanzu Site | Consultants Ltd | ||
| Vihiga Cluster Water | Structural integrity & presentation
of final report. |
Lake Victoria | 2019 |
| Supply –Kaimosi Llant | North Service | ||
| Board | |||
| Proposed Zeimar City | Structural integrity & presentation
of final report. |
Elmuab Global | 2019 |
| Market (Ghala 1, R&K | Engineering | ||
| Building, Yellow House) | Consultants | ||
| Gems Cambridge | Site investigation, laboratory testing, structural integrity & presentation
of final materials and geotechnical report. |
Multiscope | 2018 |
| International School | Consulting | ||
| Engineers Ltd | |||
| KRA Data Centre | Site investigation, laboratory testing,
concrete testing and structural integrity & presentation of final report. |
Kenya Authority | 2018 |
| Revenue | |||
| (KRA) | |||
| Iberafrica Power Station | Concrete design and other material
tests during construction |
Iberafrica Power | 2018 |
| Station | |||
| Kenya Oil Corporation | Concrete and aggregates testing. | IMCO | 2018 |
| Service Station. | |||
| B.A.T Kenya Green Leaves | Concrete Testing and
Foundation material testing |
B.A.T Kenya Ltd | 2017 |
| Treatment Godown at | |||
| Thika |
| New Ministry Centre | Material testing | China Jiangsu | 2017 |
| International | |||
| SDA Central Church | Coring and checking material on failed constructed building, Testing below foundation level Checking foundation construction. Testing of concrete cores, aggregate, sand, timber for roofing, cubes | SDA Church | 2017 |
| Seminar Hall | |||
| Non‐Motorized Traffic | CBR | Uniconsult Kenya | 2016 |
| Design | Particles sizes analysis
Atterberg Limits |
||
| Roller compacted concrete | Design work, Trial mixes &
Supervision |
Bamburi | 2016 |
| Cement/QMEC | |||
| Village Market, Kihingo | Concrete and aggregates testing | Laxmanbhai | 2015 |
| Market, Waiyaki Way | Construction Ltd | ||
| Development, United | |||
| Nation | |||
| P.D. Shah Commercial | Site investigation and Material
Testing |
Wadia | 2015 |
| Development | construction Ltd | ||
| Southern shield | Design mixes, concrete and
aggregates testing |
Twiga | 2015 |
| headquarters’ | Construction Ltd | ||
| Windsor Brookes | |||
| Proposed KPLC Upgrades | Site investigation and material
testing |
Plano consult | 2014 |
| Scada/Ems new control | |||
| Kenya Pipeline Pumping | Geotechnical Survey and material
testing |
China Petroleum | 2014 |
| Station‐ Konza, Manyani, | Pipeline | ||
| Samburu and Kipevu in | material testing | ||
| Mombasa | Engineering | ||
| Corporation | |||
| Safaricom Towers | Concrete testing for various sites. | Tulsi Construction | 2014 |
| Ltd | |||
| Soil tests Viz: Particle size analysis,
compaction, Atterberg limits, and CBR |
Eng Plan | ||
| Concrete testing for various
Safaricom sites |
Pamigo Ltd | ||
| Celtel Towers | Concrete testing for various sites | Pamigo Ltd | 2013 |
| Telkom Towers | Site investigation, laboratory testing, concrete testing and structural integrity for various Telkom tower Sites. | Distributed | 2012 |
| Communication | |||
| Systems Ltd | |||
| Site investigation, Laboratory
testing, concrete testing and |
Huawei | 2012 | |
| Technologies |
| structural integrity for various
Telkom tower sites. |
|||
| GSM Network/Econet | Site investigation, laboratory testing, concrete testing and structural integrity for various Telkom tower Sites. | Aster global | 2012 |
| towers | |||
| Cement Factory in Tanga | Nuclear Quality control of
compacted embankments |
Tanga Cement | 2011 |
| Sondu-Miriu dam Project | Radiographic, ultrasonic and
Penetrant testing of dam gates and penstock pipes |
Heavy Engineering | 2011 |
| Ltd | |||
| East Africa Oxygen | Radiographic inspection of
refabricated ammonia line butt joints |
2010 | |
| Kanyadhiang’ Water Supply | Radiography testing | Lake Victoria | 2010 |
| North Water | |||
| Services Board | |||
| New Packing Plant (2014) | Radiography Testing | East African | 2014 |
| Portland Cement |