Geotechnical Investigation Surveys and Testing
| PROJECT | SCOPE OF WORK | CLIENT | PERIOD |
| Proposed Heartland | Boreholes | Metricon Home | 2022 |
| Gardens-Mbaazi Road, | Lab testing | Nairobi Co. | |
| Plot LR. 330/155 Nairobi | Geotechnical Investigations
Geotechnical Report |
Limited | |
| Proposed Geotechnical | Boreholes
Lab testing Geotechnical Investigations Geotechnical Report |
Jiwama Architects | 2022 |
| Investigations on the | |||
| Proposed Eight Storey | |||
| One- & Two-Bedroom | |||
| Apartments Development | |||
| on Title No. Dagoretti/ | |||
| Kinoo/ 6404, Kiambu | |||
| County | |||
| Proposed Tawakal | Boreholes | Tawakal | 2022 |
| Shopping Centre, Plot LR. | Lab testing | Development | |
| LR NO. 36/II/11 | Geotechnical Investigations | ||
| Eastleigh, Nairobi County |
Geotechnical Report |
||
| Proposed Upgrading of | Trial pitting and In situ Tests
Lab testing |
Qs. Dr. Phillip | 2021 |
| Perimeter Wall at the | Muchungu of |
| LOCHAB US Embassy | Geotechnical Report | Aegis | ||
| Site | Development | |||
| Solutions Ltd. | ||||
| Proposed Trinity Holdings
Building |
Boreholes | Malkia Real Estate
Development Limited |
2021 | |
| Lab testing
Geotechnical Investigations Geotechnical Report |
||||
| Proposed Construction of | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Mr. Kuldip | 2021 | |
| the Apartment Complex | Kachwaana | |||
| Development in Machakos | ||||
| County | ||||
| Proposed Construction of | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Allen | Street | 2021 |
| the Nalani Homes Project | Investments | |||
| in Ruaka Kiambu County | Limited | |||
| Proposed Construction of | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
SAJ Ceramics | 2021 | |
| the 3 Level Storage Structure | Enterprises | |||
| Limited | ||||
| Proposed Residential | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Multiple Holdings | 2021 | |
| Apartment Buildings at | Limited | |||
| Muguga/Kanyariri Plot | ||||
| No. 1253 | ||||
| Proposed GreenField | Boreholes | ITEC Engineering | 2021 | |
| Development At Konza
City, Makueni County |
Lab testing
Geotechnical Investigations Geotechnical Report |
Limited | ||
| Proposed Residential | Boreholes | New Court | 2021 | |
| Development Along | Lab testing | Company Limited | ||
| Othaya Road in Lavington, Nairobi County | Geotechnical Investigations
Geotechnical Report |
|||
| Coffee Center | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
TharakaNithi | 2021 | |
| Development On Plot | County Coffee | |||
| LR.No | Mill Co-operative | |||
| Muthembi/Gatua/64 | Union Limited | |||
| In Chuka, Tharaka Nithi
County |
||||
| Proposed construction of the | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
RainStorm | 2021 | |
| Petrol Station at Karen End | Limited | |||
| Proposed Addition & | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Wananchi Sacco | 2021 | |
| Extension Of Existing | ||||
| Building On Plot No. | ||||
| Othaya/ Kihungiru/ 2934
Othaya Town |
||||
| Proposed Petrol Station on | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Mr. John | 2021 | ||||
| Plot LR. No. | Ndirangu Nganga | ||||||
| Ngong/Ngong/36281 | |||||||
| Proposed Construction | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Burhani Engineers | 2021 | ||||
| And Completion Of | Limited | ||||||
| Nyamira County Referral | |||||||
| Hospital Covid-19 | |||||||
| Isolation Complex | |||||||
| Gatene and Mutino | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Farmline | 2021 | ||||
| Irrigation Schemes, Embu | Consultants | ||||||
| County | Limited | ||||||
| Kandeki and | Miuka | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Gedo | Associates | 2021 | ||
| Irrigation | Schemes, | Limited | |||||
| Kirinyaga County | |||||||
| St. Mary’s | School | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Eastern Rift | 2021 | |||
| Cemetery | Extension, | Sawmills Limited | |||||
| Nairobi County | |||||||
| Proposed HeartLand | Boreholes Drilling
Laboratory Testing Geotechnical Report |
HeartLand | 2021 | ||||
| Homes Developement | Homes Limited | ||||||
| Foundation Design for | Trial pitting and In situ Tests
Lab testing Geotechnical Report |
Qs. | Phillip | 2021 | |||
| Proposed Apartments at
Riruta |
Muchungu | ||||||
| Proposed Trufoods | Boreholes Drilling
Laboratory Testing Geotechnical Report |
Trufoods Limited | 2020 | ||||
| factory, in Juja, Kiambu
County. |
|||||||
| Proposed Residential | Boreholes Drilling
Laboratory Testing Geotechnical Report |
Frame | 2020 | ||||
| Apartments for Mr. | Consultants | ||||||
| Nathan Njoroge on Plot
LR. Kiambaa/Ruaka/3981 |
Limited | ||||||
| Proposed Estate | Boreholes | Defin | Valley | 2020 | |||
| development in Athi River,
Machakos County. |
Lab testing
Geotechnical Report |
Limited | |||||
| Proposed Plant | Trial pitting and Insitu Tests
Lab testing Geotechnical Report |
Roofings | Kenya | 2020 | |||
| development in Mazeras, Kilifi County. | Limited | ||||||
| Proposed Heartland | Boreholes | Heartland Kenya | 2019 | ||||
| Gardens-Kindaruma Road, | Lab testing | Limited | |||||
| Nairobi. | Geotechnical Report | ||||||
| Proposed Residential | Boreholes | Savpan Ltd | 2019 | ||||
| Building on Plot LR. No. | Lab testing | ||||||
| Kiambaa | Ruaka | 38 | 78- | Geotechnical Report | ||||
| Ruaka Kiambu | ||||||||
| Geotechnical Survey for | Boreholes | M/S West Kenya Union Conference SDA Church | 2019 | |||||
| Plot No.LR 209/3205 | Lab testing | |||||||
| Mazera Road Kileleshwa | Geotechnical Report | |||||||
| Proposed Studio | Boreholes | Infratech Projects | 2019 | |||||
| Apartments Development | Lab testing | Ltd | ||||||
| on Plot LR. No. Kiambaa | Geotechnical Report | |||||||
| Ruaka 5422-Ruaka | ||||||||
| Kiambu | ||||||||
| Development of 1255- | Boreholes and Trial Pits
Lab testing Geotechnical Report |
Vipingo | 2018 | |||||
| Palm Ridge Kilifi County | Development | |||||||
| Limited | ||||||||
|
D.O.D Hurlingham Site |
Boreholes | Sahson | 2018 | |||||
| Lab testing | Construction | |||||||
| Geotechnical Report | Company Ltd | |||||||
| Proposed | Warehouse- | Geotechnical Investigations
Lab testing Geotechnical Report |
Total Kenya | 2018 | ||||
| Nairobi, | Mombasa | & | Limited & KENT | |||||
| Kisumu | Africa Limited. | |||||||
| Proposed Office Building
Development on James Gichuru Road |
Boreholes | Whitefield | Place | 2017 | ||||
| Lab testing
Geotechnical Report |
Limited | |||||||
| Proposed Streetscape and | Boreholes | Dar-al-handasah | 2016 | |||||
| subsurface utilities at | Lab testing | shair and partners | ||||||
| Konza Techno City | Geotechnical Investigations | & Runji and | ||||||
|
Geotechnical Report |
Partners | |||||||
| Proposed Development at
Old Ngara Estate |
Boreholes | Rwathia | 2017 | |||||
| Lab testing
Geotechnical Report |
Distributors Ltd &
Kiewa Ltd |
|||||||
| Proposed | Extension | of | Geotechnical drilling
Laboratory testing Geotechnical Report |
Coca Cola Kenya | 2015 | |||
| Coca Cola Factory | at | |||||||
| Embakasi, | Nairobi | |||||||
| Sparr Drilling Co. Ltd Sites | Lab testing
Geotechnical Investigations Geotechnical Report |
Sparr Drilling Co.
Ltd |
2015/
2016/ 2017 |
|||||
| Proposed Substations: | Geophysical Survey
Geotechnical Investigations Lab testing Geotechnical Report |
KPLC, Langfield | 2015
onwards |
|||||
| Nyamira, Kutus, Molo, | S & Nanjing steel | |||||||
| Kabiyet, Mikinduri, | Tower | |||||||
| Kiamutugu, Rabai, | Manufacturing | |||||||
| Endebes, Kapsowar, | System Limited | |||||||
| Moiben, Ortum, Sirisia, | Co. Ltd | |||||||
| Isinya, Suswa, Kiambere, | ||||||||
| Bamburi, Lanet, Kiganjo, | |||
| Meru, Voi etc | |||
| Proposed Sub-Stations: | Full range of tests | KETRACO, | 2014 |
| Sotik in Bomet County | China CAMC | ||
| Engineering | |||
| Co.Ltd | |||
| Proposed Construction of | Full range of tests | Arcs Africa | 2014 |
| factories in Ruiru | |||
| Proposed Construction of | Full range of tests | Arcs Africa | 2014 |
| factories in Ruiru and Tatu | |||
| City | |||
| Proposed School | Full range of tests | TURKISH | 2014 |
| EMBASSY | |||
| Geotechnical investigation | Boreholes | Kenya Bankers | 2006-2014 |
| for multi-story buildings | Lab testing | Association | |
| Geotechnical Investigations | Upper hill | ||
| Geotechnical Report | Office | ||
| Complex | |||
| Farmers | |||
| Choice- | |||
| Lavington | |||
| Karen Hotel
Parklands Office Suites Jamii Milling ‐ Eldoret |
|||
| Proposed Lamu – | 16 No. Boreholes
Lab testing Geotechnical Report |
Toyota Tshusho | 2012 |
| Lokichgio Pipeline | Corporation | ||
| Feasibility Study | |||
| (LAPPSET) |





